Maintenance timeframe from handover date 

SINo
Issue
Timeframe from the Handover Date
1
Door shutter & lock issues due to seasonal weather changes:
1a
Carpentry issues such as the alignment of the shutter with the frame
Up to 6 months
1b
Lock or tower bolt misalignment preventing it from latching properly
Up to 6 months
2
Sanitary & CP fixtures:
2a
Leaks due to accumulation of any sediments in the taps, faucet, showerheads.
Up to 6 months
3
Water stagnation around the grating due to undulation or poor slope.
Up to 6 months
4
Windows, mosquito mesh:
4a
Alignment issues caused due to excessive force used at the time of closing the shutters.
Up to 6 months